Solutions
Design Review for Construction Managers
Why Construction Managers Need Design Review
Construction Managers are accountable for overseeing the full design and construction process, including QA/QC across every trade and discipline. One thing that keeps coming up for this role is not having a consistent, firm wide way to catch coordination and code issues before they turn into expensive field problems.
Design Review is meant to fix that. It gets applied during design development, before drawings are finalized, with a specific goal: catch issues early, while they're still cheap to fix, instead of after documents are further along.
What Structured AI Checks for Construction Managers
For construction managers running design review, Structured AI uses Document Chat paired with Custom Checks, so the team can interrogate the drawing set as it evolves and run firm specific checks throughout design. Findings are scoped to what this role is actually on the hook for, not a generic error list, but issues organized around overseeing the full design and construction process, including QA/QC across every trade and discipline.
Structured AI's check library spans every discipline, structural, architectural, mechanical, electrical, plumbing, fire protection, and civil, giving a construction manager one consistent standard applied across every trade rather than review quality that varies by who's checking which set.
Where This Fits in Your Workflow
Design Review for construction managers usually happens during design development, before drawings are finalized. Structured AI works on .pdf, .dwg, .rvt, and .ifc files, and for Revit modeled projects, the Revit Add-In runs the same checks directly against live geometry with element level results, no export needed. Findings can be exported and assigned by trade or discipline, so the review step slots into the existing document workflow instead of adding a new one.
FAQ
How is design review different from a general plan check? Design Review is scoped to what actually matters at this stage of the project and for this role: catch issues early, while they're still cheap to fix, instead of after documents are further along. It uses Structured AI's deterministic checks rather than a confidence-scored, probabilistic flag.
Do construction managers need special training to use this? No. Upload the relevant drawings and specifications, or connect the Revit model directly, and findings come back organized the way construction managers already review work. Teams can also build Custom Checks in plain English without writing any code.
Can findings be shared with the rest of the project team? Yes. Every finding links back to the exact sheet and location, and can be exported and assigned by trade or discipline for team wide visibility and follow up.
More for this role
This review for other roles
See It on Your Own Drawings
Book a demo and watch Structured review a real drawing set: every finding with the exact page, location, issue, and fix.
Book a Demo