Solutions
QA/QC Review for Construction Managers
Why Construction Managers Need QA/QC Review
Construction Managers carry accountability for overseeing the full design and construction process, including QA/QC across every trade and discipline. A common friction point: not having a consistent, firm wide way to catch coordination and code issues before they turn into expensive field problems.
QA/QC Review is meant to fix that. It gets applied as a standardized quality control step applied consistently across projects, with a specific goal: give a firm a repeatable, documented QA/QC process instead of relying on whichever reviewer has time that week.
What Structured AI Checks for Construction Managers
For construction managers running qa/qc review, Structured AI uses the full QA/QC Compliance Checks library, which grows check by check as the firm defines what matters, so every project gets the same standardized review. Findings are scoped to what this role is actually on the hook for, not a generic error list, but issues organized around overseeing the full design and construction process, including QA/QC across every trade and discipline.
Structured AI's check library spans every discipline, structural, architectural, mechanical, electrical, plumbing, fire protection, and civil, giving a construction manager one consistent standard applied across every trade rather than review quality that varies by who's checking which set.
Where This Fits in Your Workflow
QA/QC Review for construction managers usually happens as a standardized quality control step applied consistently across projects. Structured AI works on .pdf, .dwg, .rvt, and .ifc files, and for Revit modeled projects, the Revit Add-In runs the same checks directly against live geometry with element level results, no export needed. Findings can be exported and assigned by trade or discipline, so the review step slots into the existing document workflow instead of adding a new one.
FAQ
How is qa/qc review different from a general plan check? QA/QC Review is scoped to what actually matters at this stage of the project and for this role: give a firm a repeatable, documented QA/QC process instead of relying on whichever reviewer has time that week. It uses Structured AI's deterministic checks rather than a confidence-scored, probabilistic flag.
Do construction managers need special training to use this? No. Upload the relevant drawings and specifications, or connect the Revit model directly, and findings come back organized the way construction managers already review work. Teams can also build Custom Checks in plain English without writing any code.
Can findings be shared with the rest of the project team? Yes. Every finding links back to the exact sheet and location, and can be exported and assigned by trade or discipline for team wide visibility and follow up.
More for this role
This review for other roles
See It on Your Own Drawings
Book a demo and watch Structured review a real drawing set: every finding with the exact page, location, issue, and fix.
Book a Demo