Back to Home

Features

No flags, just actions. Every compliance check comes with a location, a description, and a recommended solution.

QA/QC compliance checks interface showing flagged items on a drawing

QA/QC Compliance Checks

Parse through large compliance documents in minutes, not days. Every compliance check comes back with the exact page, where on that page, what is wrong, and how to fix it.

No confidence percentages. A deterministic list your team can act on and sign off on. The check library keeps growing, built check by check as your firm defines what matters.

Version ComparisonControl ComparisonCode and Compliance BrowserAnnotations and CommentsTakeoffs
Upload drawing
Run check
Review set
Export tasks
Resolve

Every check. Every discipline.

ACC-001 Accessible Path of Travel
ACC-002 Lift Provision and Shaft Dimensions
ACC-003 Livable Housing Design
ADG-001 Apartment Size Minimums
ADG-003 Solar Access Compliance
ADG-005 Ceiling Height Compliance
COM-009 GFA / FSR Schedule Present
COM-010 Shadow Diagram Set Completeness
COM-011 BASIX Certificate Consistency
COM-012 Door Schedule Completeness
COM-017 Waterproofing Plan Completeness
COM-018 Fire Compartmentation Plan Completeness
COM-020 Adaptable and Livable Housing Notation
DBP-001 Regulated Design Present
DBP-002 Design Compliance Declaration
DBP-003 Registered Design Practitioner
DBP-004 Design Change Management
FAC-001 Facade Head, Sill, and Jamb Details
FAC-002 Facade System Transition and Weatherproofing Continuity
FAC-BAL-001 Balustrade Height Not Confirmed
FIRE-COMP-001 Compartmentation at Inset Terrace Slab Opening
FIRE-EGRS-001 Second Protected Exit Not Confirmed
FIRE-ESC-001 Travel Distance to Exits
FIRE-LIFT-001 Evacuation Lift Lobby Fire Separation
INT-001 Balustrade and Handrail Schedule Compliance
INT-002 Stair Dimensional Compliance
MIX-001 Class Separation - Fire and Access
MIX-002 Ground Floor Commercial Ceiling Height
MIX-005 Acoustic Separation - Residential Above Commercial
PLAN-002 Site Coverage Calculation
PLAN-003 Setback Compliance
PLAN-004 FSR / GFA Schedule
PLAN-006 BASIX Certificate Consistency
WPF-001 Wet Area Extents, Falls, and Wastes
WPF-002 Balcony and Terrace Threshold and Membrane Continuity
WPF-003 Shower Hob or Threshold Condition
WPF-004 Membrane Upturns and Extent Annotation
WPF-TER-001 Inset Terrace Threshold Waterproofing
CIV-1 811 Logo Check
CIV-2 Benchmark and Datum Reference Check
CIV-3 Cover Sheet Completeness Check
CIV-4 Demolition Plan Check
CIV-5 Earthwork Quantities Check
CIV-6 Engineer Seal and Signature Check
CIV-7 General Notes Sheet Check
CIV-8 Key Map and Match Line Check
CIV-9 Legend and Symbol Table Check
CIV-11 Plan and Profile Check
CIV-12 Roadway Graph Analysis and Lot Number Verification
CIV-13 Sight Triangle Check
CIV-14 Street Name Labeling Check
CIV-15 Title Block Fields Completeness Check
CIV-16 Vicinity and Location Map Check
CIV-17 Sidewalk Width Per Agency Standard
CIV-21 Boundary Grade Matching Check
CIV-22 Gutter Slope Compliance Check
CIV-23 Breakover Conditions Check
CIV-24 Stormwater Runoff Direction Check
DEMO-1 Panel Schedule Spare Overloading
DEMO-2 Missing GFCI Protection
DEMO-3 Electrical Room NEC Clearance
DEMO-4 Panel Phase Load Imbalance
DEMO-5 Unlabeled Circuit Breakers
DEMO-6 Missing Equipment Grounding Details
DEMO-7 Legend Symbol Inconsistency
DEMO-8 Conduit Routing Deficiencies
ELEC-1 Equipment Powered with Correct Voltage
ELEC-2 Equipment Voltage Cross-Reference
ELEC-3 Wire and Conduit Coordination
EQP-1 Inverters Shown on Siteplans
EQP-2 Panels Shown on Floorplans
EQP-3 Panels Shown on Siteplans
EQP-4 Switchboards Shown on Siteplans
EQP-5 Switchgear Shown on Siteplans
EQP-6 Transformers Shown on Siteplans
MAC-1 NEC Working Space and Equipment Clearance
MAC-2 SLD and Schedule Cross-Reference
MAC-3 Power Plan Circuiting and Protection
MAC-4 Lighting Coverage and Emergency Illumination
MAC-5 Drawing Set Organization and Completeness
MAC-6 Utility and Service Coordination
MAC-7 Architectural Clash Coordination
NEC-1 240.87 Arc Energy Reduction
NEC-2 240 Conductor Protection Adequacy
NEC-3 215 Feeder and Transformer Secondary Conductor Sizing
NEC-4 230.95 GFPE Verification
NEC-5 240.4 Breaker-to-Wire Coordination
NEC-6 430.22 Motor Branch-Circuit Conductor Sizing
NEC-7 110.26 Working Space Check
NEC-8 110.9 SCCR Verification
PNL-1 AC Switchgear Load Verification
PNL-2 Ampacity Rating Check
PNL-3 Breaker Settings Verification
PNL-4 Cable and Power Provision Check
PNL-5 Panelboard Ampacity Check
PNL-6 SLD Cable Verification
SLD-1 SLD vs Schedule Comparison
SLD-2 Light Fixture Schedule Count Verification
SOL-1 Inverter Quantity: Plans vs Schedules
SOL-2 PV Module Quantity: Plans vs Schedules
SOL-3 Inverter Quantity: SLD vs Plans
SOL-4 Solar Inverter Datasheet Verification
SOL-5 Solar Panel Datasheet Verification
FIRE-001 Building Classification and Type of Construction
FIRE-002 Fire Compartmentation Plans Complete
FIRE-004 Rated Walls Continuous to Slab Soffit
FIRE-005 Shaft and Riser Enclosure Integrity
FIRE-006 Fire Door Schedule Four-Step Audit
FIRE-007 Egress Travel Distances
FIRE-008 Penetration Fire-Stopping Strategy
FIRE-009 Perimeter Fire Barrier and Spandrel at Facade
FIRE-FRL-001 FRLs Nominated for Required Elements
GEN-1 Spellcheck
GEN-2 Drawing Index Check
GEN-4 Dead References
GEN-5 North Arrow and Scale Check
GEN-6 Title Block Consistency Check
GEN-7 Code and Standard Consistency Check
GEN-8 Drawing Callout Reference Match
GEN-10 Sheetnote Check
MECH-1 Equipment Tag Check
MECH-2 Equipment Details Check
MECH-3 Pipe Run Check
MECH-5 Volume Damper BIM Check
MECH-6 Volume Damper Check
PIPE-1 Pipe Sizing Velocity Check

Built for every role on the project

Architects

Stage 4. 500 pages. Fire strategy, waterproofing, accessibility reviewed against the fire report, sheet by sheet.

Structured checks the same package in 20 minutes and returns every compliance check with the exact page and a recommended fix.

MEP Engineers

Coordinating mechanical, electrical, and plumbing in 2D means tracking conflicts across dozens of sheets without a model.

Structured flags every coordination conflict before the set leaves the office: above-ceiling clashes, penetrations through fire-rated assemblies, equipment missing on plans.

General Contractors

Coordination failures missed in the office become RFIs in the field. At 9.9 per million of contract value, they become the cost structure.

Structured reviews drawing sets at preconstruction and surfaces scope gaps and coordination failures before mobilisation.

Estimators

Bidding from incomplete drawings is standard. Scope gaps surface during buyout or on site.

Structured extracts equipment lists and quantities automatically and flags missing scope before bid day.

Integrated with your workspace

GmailOutlookMicrosoft WordMicrosoft ExcelMicrosoft SharePointGoogle DriveAutodesk RevitBluebeamProcoreAutodesk Construction Cloud

See it on your drawings

Book a demo and we will walk through Structured on your actual project documents.

Book a Demo
Structured logo
STRUCTURED

Copyright 2026 Structured AI. All rights reserved.