ENR reports on Structured AI's $4.2m fundraise and partnership with Syska Hennessy

Solutions

Change Order Prevention for MEP Engineers

Why MEP Engineers Need Change Order Prevention

MEP Engineers carry accountability for mechanical, electrical, and plumbing system design and how it coordinates with structural and architectural constraints. A common friction point: routing conflicts with structural members or architectural ceiling heights that don't get caught until shop drawing phase.

That's exactly where Change Order Prevention comes in. It runs throughout design and preconstruction, anywhere undetected conflicts could later surface as field change orders, and the point of it is to catch the design errors that typically turn into expensive change orders, before construction starts.

What Structured AI Checks for MEP Engineers

For mep engineers running change order prevention, Structured AI uses QA/QC Compliance Checks and Overlay run early, catching the coordination and code issues that would otherwise show up later as field change orders. Findings are scoped to what this role is actually on the hook for, not a generic error list, but issues organized around mechanical, electrical, and plumbing system design and how it coordinates with structural and architectural constraints.

Coordinating mechanical, electrical, and plumbing in 2D means tracking conflicts across dozens of sheets without a model. Structured flags every coordination conflict before the set leaves the office: above-ceiling clashes, penetrations through fire-rated assemblies, equipment missing on plans.

Where This Fits in Your Workflow

Change Order Prevention for mep engineers usually happens throughout design and preconstruction, anywhere undetected conflicts could later surface as field change orders. Structured AI works on .pdf, .dwg, .rvt, and .ifc files, and for Revit modeled projects, the Revit Add-In runs the same checks directly against live geometry with element level results, no export needed. Findings can be exported and assigned by trade or discipline, so the review step slots into the existing document workflow instead of adding a new one.

FAQ

How is change order prevention different from a general plan check? Change Order Prevention is scoped to what actually matters at this stage of the project and for this role: catch the design errors that typically turn into expensive change orders, before construction starts. It uses Structured AI's deterministic checks rather than a confidence-scored, probabilistic flag.

Do mep engineers need special training to use this? No. Upload the relevant drawings and specifications, or connect the Revit model directly, and findings come back organized the way mep engineers already review work. Teams can also build Custom Checks in plain English without writing any code.

Can findings be shared with the rest of the project team? Yes. Every finding links back to the exact sheet and location, and can be exported and assigned by trade or discipline for team wide visibility and follow up.

See It on Your Own Drawings

Book a demo and watch Structured review a real drawing set: every finding with the exact page, location, issue, and fix.

Book a Demo