ENR reports on Structured AI's $4.2m fundraise and partnership with Syska Hennessy

Solutions

Change Order Prevention for General Contractors

Why General Contractors Need Change Order Prevention

General Contractors are accountable for constructability, schedule, and resolving design conflicts before they become field RFIs or change orders. One thing that keeps coming up for this role is inheriting design team coordination gaps as field problems, with the cost and schedule risk landing on the GC.

That's exactly where Change Order Prevention comes in. It runs throughout design and preconstruction, anywhere undetected conflicts could later surface as field change orders, and the point of it is to catch the design errors that typically turn into expensive change orders, before construction starts.

What Structured AI Checks for General Contractors

For general contractors running change order prevention, Structured AI uses QA/QC Compliance Checks and Overlay run early, catching the coordination and code issues that would otherwise show up later as field change orders. Findings are scoped to what this role is actually on the hook for, not a generic error list, but issues organized around constructability, schedule, and resolving design conflicts before they become field RFIs or change orders.

Coordination failures missed in the office become RFIs in the field. At a documented rate of 9.9 per million dollars of contract value, they become part of the project's actual cost structure. Structured AI reviews drawing sets at preconstruction and surfaces scope gaps and coordination failures before mobilization.

Where This Fits in Your Workflow

Change Order Prevention for general contractors usually happens throughout design and preconstruction, anywhere undetected conflicts could later surface as field change orders. Structured AI works across the PDF set and the BIM model (.pdf, .dwg, .rvt and .ifc files), and inside Revit, AutoCAD and Civil 3D the plugins run the same checks on the live model or drawing, checked against the set, with element-level results and no export needed. Findings can be exported and assigned by trade or discipline, so the review step slots into the existing document workflow instead of adding a new one.

FAQ

How is change order prevention different from a general plan check? Change Order Prevention is scoped to what actually matters at this stage of the project and for this role: catch the design errors that typically turn into expensive change orders, before construction starts. It uses Structured AI's deterministic checks rather than a confidence-scored, probabilistic flag.

Do general contractors need special training to use this? No. Upload the relevant drawings and specifications, or connect the Revit model directly, and findings come back organized the way general contractors already review work. Teams can also build Custom Checks in plain English without writing any code.

Can findings be shared with the rest of the project team? Yes. Every finding links back to the exact sheet and location, and can be exported and assigned by trade or discipline for team wide visibility and follow up.

See It on Your Own Drawings

Book a demo and watch Structured AI review a real drawing set: every finding with the exact page, location, issue, and fix.

Book a Demo