ENR reports on Structured AI's $4.2m fundraise and partnership with Syska Hennessy

Solutions

Change Order Prevention for Owners' Representatives

Why Owners' Representatives Need Change Order Prevention

Protecting the owner's interests across design and construction, including catching issues the design team might miss is what Owners' Representatives are on the hook for. And a recurring problem is needing an independent, defensible way to verify design quality before the owner commits capital to a permit submittal or GMP.

Change Order Prevention is meant to fix that. It gets applied throughout design and preconstruction, anywhere undetected conflicts could later surface as field change orders, with a specific goal: catch the design errors that typically turn into expensive change orders, before construction starts.

What Structured AI Checks for Owners' Representatives

For owners' representatives running change order prevention, Structured AI uses QA/QC Compliance Checks and Overlay run early, catching the coordination and code issues that would otherwise show up later as field change orders. Findings are scoped to what this role is actually on the hook for, not a generic error list, but issues organized around protecting the owner's interests across design and construction, including catching issues the design team might miss.

A deterministic, source-linked finding, exact page, exact location, what's wrong, how to fix it, gives an owner's representative something concrete and defensible to point to when verifying design quality independently of the design team's own sign-off.

Where This Fits in Your Workflow

Change Order Prevention for owners' representatives usually happens throughout design and preconstruction, anywhere undetected conflicts could later surface as field change orders. Structured AI works across the PDF set and the BIM model (.pdf, .dwg, .rvt and .ifc files), and inside Revit, AutoCAD and Civil 3D the plugins run the same checks on the live model or drawing, checked against the set, with element-level results and no export needed. Findings can be exported and assigned by trade or discipline, so the review step slots into the existing document workflow instead of adding a new one.

FAQ

How is change order prevention different from a general plan check? Change Order Prevention is scoped to what actually matters at this stage of the project and for this role: catch the design errors that typically turn into expensive change orders, before construction starts. It uses Structured AI's deterministic checks rather than a confidence-scored, probabilistic flag.

Do owners' representatives need special training to use this? No. Upload the relevant drawings and specifications, or connect the Revit model directly, and findings come back organized the way owners' representatives already review work. Teams can also build Custom Checks in plain English without writing any code.

Can findings be shared with the rest of the project team? Yes. Every finding links back to the exact sheet and location, and can be exported and assigned by trade or discipline for team wide visibility and follow up.

See It on Your Own Drawings

Book a demo and watch Structured AI review a real drawing set: every finding with the exact page, location, issue, and fix.

Book a Demo